Laboro
412 Rowan Street · LL11 / FISP
Pillar 01 · Co-PM

Runs the PM's work, not the engineer's.

The TR1/TR8 is sealed by the RDP. Laboro runs the PM's work: coordinate the inspection, get the work ready to pass, and hand the engineer a served package.

DOB NOW · Permit M01234567-I-SH · ACTIVE synced 2 h ago
Compliance timeline · 412 Rowan Street
  1. Sidewalk Shed / Supported Scaffold Permit
    Permit M01234567-I-SH
    Complete
  2. Protection verified on site
    Pedestrians + adjacent property
    Complete
  3. 4
    Structural steel probes
    Pending
  4. 5
    Terra-Cotta Patching & Replacement
    Pending
  5. 6
    Re-pointing (floors 14-15, North)
    Pending
  6. 7
    Final Inspection per Directive 14/75
    Pending
Next PM action
Masonry Brick & Mortar Inspection
BC 1705.4 · Special inspection · Permit M01234567-I-SH

Before you call, verify it will pass

ASTM C270 Type N mortar cured
Sample panel approved by the architect
Shoring/protection of existing masonry on site
✓ All verified — the inspection should pass on the first try. No re-inspection, no extra cost.
PM
Coordination draft To: Special inspector · CC: Dana Whitmore, PE (RDP)

Subject: Special inspection coordination — Masonry (BC 1705.4) · 412 Rowan Street · Permit M01234567-I-SH

Good afternoon — the masonry face at 412 Rowan Street is ready for the Masonry Brick & Mortar special inspection under BC 1705.4. Requesting a site visit this week, preferably Thursday, July 17, 9:00 am.

Scope to inspect: mortar mix (ASTM C270 Type N, sample panel approved), brick match against existing, and header course on floors 14-15, North elevation. Shoring and protection installed and verified.

CC to Dana Whitmore, PE (RDP) for the record. Confirming access via the sidewalk shed, Rowan St entrance.

📦
Evidence package · Masonry (BC 1705.4) Proposed date: Thu Jul 17 · 9:00 am · 412 Rowan Street
Site photos
Header course · N
Shoring · floor 14
Sample panel
PM confirmations
✓ Mortar verified ✓ Brick match approved ✓ Shoring on site
Ready for the RDP (Dana Whitmore, PE) to review, seal and file the TR1/TR8

Laboro doesn't file the TR1 — it hands the engineer a served package.

Pillar 02 · Critical path

Which milestone moves the date — and which doesn't.

Laboro computes the dependency chain from the plans and tells you which milestone moves the sign-off date — and which one has slack.

6 of 8 milestones on the critical path

The length of the critical chain defines FISP sign-off. Everything else is slack.

Dependency chain · 412 Rowan Street
  1. Sidewalk Shed / Scaffold Permit
    CriticalComplete
  2. Protection verified
    CriticalComplete
  3. 3
    Masonry Removal & Inspection (BC 1705.4)
    CriticalIn progress
  4. 4
    Structural steel probes
    Conditional · 3 d slack
  5. 5
    Terra-Cotta Patching & Replacement
    Critical
  6. 6
    Re-pointing floors 14-15 (North)
    Critical
  7. 7
    Joint sealant
    5 d slack · can overlap
  8. 8
    Final Inspection Directive 14/75
    CriticalEnd · Sign-off
⚠️
Current bottleneck
Masonry inspection (BC 1705.4)

Blocks Terra-cotta and Re-pointing. A delay here pushes FISP sign-off 1:1.

Approving Masonry enables in parallel:
Terra-Cotta Patching & Replacement — critical, starts immediately.
Structural steel probes — 3 d slack, can be sequenced without moving the date.
Available slack

2 milestones with slack — Joint sealant (5 d) and Structural steel probes (3 d) — can be reordered without moving the sign-off date.

Pillar 03 · Live portal

The report becomes a living deliverable.

The owner stops asking for updates by email: they see real progress, live, with evidence.

Owner view · 412 Rowan Street
0%Progress
Compliance progress

2 of 7 milestones completed · Masonry in progress this week

Masonry (BC 1705.4)In progress
Terra-cottaPending
Re-pointingPending
Final · Dir. 14/75Pending
Recent evidence
East Facade · Jul 11
14th Floor North · Jul 10
Shed Rowan St · Jul 9
Last updated 2 h ago